Hall Davis | Beechwood Mews, Finchley
790
portfolio_page-template-default,single,single-portfolio_page,postid-790,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,qode-content-sidebar-responsive,qode-theme-ver-10.1.2,wpb-js-composer js-comp-ver-7.1,vc_responsive
 

Beechwood Mews, Finchley

Client/Contractor

Kuropatwa

Architect

Peter Barber Architects

Approximate contract value

£25m

Category
Basement, Residential
About This Project

An award winning residential development located in Finchley on the A406 North Circular. The Architects have cleverly designed a mews development creating a quiet zone very close to the busy A406 that encourages neighbourly encounters and interactions. The buildings range from 3-6 storeys and includes a 250m long basement car park which runs below the entire length of the mews. This was a very challenging project with was cured on plan and sloped in 2 directions across the site. Hall Davis provided structural and civil engineering services. The buildings were formed in a combination of RC frame and traditional masonry. The site has had some challenging drainage design issues including a major trunk sewer that run below the site and required Thames Water build over licences for the temporary and permanent diversions. Hall davis also carried out temporary works design for the project.